Completed Structures
Tri-County Service Region
General ContractorPrecast & Cast-in-Place

We Build
Where
You Park.

From the Coalfield corridor to the Ridgecrest metro belt, Slab has poured concrete decks for county hospital systems, downtown revitalization districts, and university campuses tired of surface lots eating green acreage. Precast speed. Cast-in-place permanence. Your site, your schedule.

47
Structures Delivered
28K+
Spaces Built
14mo
Avg. Completion
Precast Concrete
Cast-in-Place
Municipal Structures
Hospital Campus Decks
University Parking
Downtown Mixed-Use Garages
Greenfield Construction
Retrofit & Expansion
EV-Ready Infrastructure
12–18 Month Delivery
Precast Concrete
Cast-in-Place
Municipal Structures
Hospital Campus Decks
University Parking
Downtown Mixed-Use Garages
Greenfield Construction
Retrofit & Expansion
EV-Ready Infrastructure
12–18 Month Delivery
Construction workers on a concrete parking structure frame at sunrise with rebar visible
Hospital
May 2019
Project 01 / 03

Harlan County Medical Center Parking Structure

Harlan County, KY

Structure Type
Precast Concrete
Levels
4 Above Grade
Total Spaces
380
Groundbreak
March 2018
Ribbon-Cut
May 2019
Timeline
14 months

The surgical wing expansion demanded 380 new spaces before the first patient arrived. We broke ground in March, ran dual precast erection crews, and delivered in 14 months — two months ahead of the hospital's occupancy deadline. Four above-grade decks, EV conduit roughed in on every level.

Client
Harlan ARH Hospital
"Slab came in, poured concrete, and left us a structure that works. No drama, no schedule excuses."
— Director of Facilities, Harlan ARH
Aerial view of a multi-story concrete parking garage in an urban downtown district
Municipal
October 2021
Project 02 / 03

Millbrook Downtown Mixed-Use Garage

Millbrook, TN

Structure Type
Cast-in-Place Concrete
Levels
6 Above Grade
Total Spaces
720
Groundbreak
January 2020
Ribbon-Cut
October 2021
Timeline
21 months

The city's bond program needed a structure that anchored a full block of mixed-use redevelopment — retail at grade, six decks above. Cast-in-place gave the city the long-term durability profile their engineers required. Ground-floor retail bays delivered to shell condition. 720 spaces opened with the adjacent hotel.

Client
City of Millbrook — Revitalization Bond Program
"The bond program required we hit a hard open date. Slab was the only contractor who gave us a contract with teeth."
— City Engineer, City of Millbrook
Concrete parking structure under construction on a university campus with cranes and precast panels
University
December 2020
Project 03 / 03

Ridgecrest University Campus Deck A

Ridgecrest, VA

Structure Type
Precast Concrete
Levels
5 Above Grade
Total Spaces
560
Groundbreak
August 2019
Ribbon-Cut
December 2020
Timeline
16 months

The facilities director had watched three surface lots consume acreage the university needed back for green space and pedestrian corridors. Five precast decks reclaimed 4.2 acres. Crew of 10 erected 3,800 sq ft of deck per day. The structure opened before spring semester registration — on the schedule the provost had promised the board of trustees.

Client
Ridgecrest State University — Facilities Management
What We Build

Concrete expertise.
Every structural system.

Get Priced

Precast Concrete Systems

Factory-manufactured double tees, inverted beams, spandrels, and wall panels erected on-site by crews of 8–12. Foundation and fabrication run simultaneously — compressing your schedule by up to 30%.

3,500–4,500 sq ft deck per day

Cast-in-Place Concrete

For projects demanding maximum long-term durability and design flexibility. Preferred by municipal engineers on downtown structures with 50+ year service life requirements.

18–24 month typical delivery

Retrofit & Expansion

Adding decks or bays to existing structures without closing operations. We've extended structures mid-season for hospitals that couldn't afford a single day of reduced parking.

Zero-closure methodology

Schedule-Driven Delivery

Municipal bonds, hospital opening dates, and university enrollment deadlines don't move. We build contracts with milestones and penalties, not aspirational timelines.

Hard-date contractual commitments

EV & Smart Infrastructure

Conduit roughed in on every level. Solar canopy structural prep. EV charging load capacity engineered from the footing up, not bolted on after.

Future-ready from day one

Bond Program Experience

We understand prevailing wage requirements, public bid processes, and the documentation burden that comes with municipal financing. We've been through it 47 times.

$200M+ in bond-funded structures
Direct Pricing

Your site.
Your budget.
Your number.

We don't do discovery calls. Give us your zip code, space count, and site condition — we'll give you a real number within one business day. Average structure runs $20,000–$30,000 per space all-in.

47
Structures Delivered
since 2009
28,400
Parking Spaces Built
across the region
14
Avg. Months to Complete
groundbreak to ribbon-cut
$7M+
Avg. Structure Value
per delivered project

Precast erection crews of 8–12 workers place 3,500–4,500 sq ft of deck per day. We compress your schedule by running foundation and fabrication simultaneously.

1
2

Tell us about your site.

Step 1 of 2 — Project basics